Wednesday, June 5, 2013

Composite Underground Systems Coordination Plan

VDC is assisting the head superintendent with the locations and installation sequences for 9 systems using a floor plan with its building systems color coded (in this case a composite underground foundation/plumbing/electrical plan).
VDC coordinated and color coded the following systems: Garage drain vents, garage drains, trap primers, sub-surface drainage, sanitary drains, gas oil separators, clear waste water, temporary power conduit and grounding triads.  Elevation text is also given for specific inverts at multiple pitch locations.

This is a prime example of creating a 2 Dimensional document for field use from multiple BIMs.